We've gotten a ton done lately! From "To Do List 2010" here's what we've completed so far:
Completed Jan/Feb.
Take care of Christmas lights and decorations
test appropriate lights
Fill in holes/ low spots at driveway entrance
Run Kubota and add fuel treatment
Make the shower hotter
Swept Garage and cleaned some (I think we've done this twice)
Hang and Fix Laundry room doors
Put Manure on Garden
Pick out new glasses for Andrew
Change Oil - Truck, Subaru
Take car to Frankfort for Oil Change
Remove small dead evergreen
Move and bolt down Gazebo
Cut off fence posts at Driveway entrance and reset the gate opener

Completed March/April:
Taxes
Bathed DC and Grace
Plant entrance flowers (60+ wave petunias and pansies)
finish filing horse feet
sold belly mower on Craigslist!!
Concrete sidewalk, parking pad and tack room - take measurements and call for quotes
Disc and seed front pasture
Place temporary fence for new grass
finish bush hog repair
fix weed eater
weed gated entrance
Weld wheels on finish mower - quoted and finished 4/17 much to Erin's joy
filled in removed tree holes and low spots
seeded filled areas

More progress pictures coming soon!

Finished wash rack - posts have been set since we built the fence - just never got the bar properly installed. And below: Andrew is "testing" the wash rack.


I think the problem is with Andrew is that he needs to be using his boat more: